Under Severn Trent’s E5 Consortia for AMP 5 works, Utile have been contracted by Costain to design, supply and install Utile, continuous anaerobic digester Gas Mixing Systems in the 6 new Gas Phase Digesters and the 1 new Acid Phase Digester for this plant expansion. Each GPD will be fitted with a single Utile Model L175HP, ATEX compliant, oil lubricated, sliding vane, air-cooled, gas compressor package, driven by a 18.5kW WEG motor to IEC1 efficiency and WIMES spec. The two compartments of the APD tank will each be fed using the Utile Model L130HP with 15kW motors. All manufactured at our Northamptonshire works.

This prestigious contract is currently under construction with a view to completion late 2014.