St Helens – J Murphy & Sons

St Helens – J Murphy & Sons

Contracted by J Murphy & Sons, Utile have supplied a double (duty & assist) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with IGEM/UP/2 and CE requirements, for installation in the...
Strongford STW – Severn Trent Water

Strongford STW – Severn Trent Water

Working alongside NMCN once more on the THP Sludge Project, Utile have supplied a double (duty & standby) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with ATEX and DSEAR requirements,...
Utile Gas Boosters

Utile Gas Boosters

Contracted by Ener-G once again, Utile have supplied 8No. natural gas booster packages to supply elevated gas pressure to feed their CHP engines installed on an 18 MWatt gas fired STOR and Peak Power lopping power station.

Burnley STW

Burnley STW

As part of United Utilities Water plc, AMP5 Capital Delivery, Utile were selected to partner KMI Plus, (a joint venture between Keir, J Murphy, Interserve and Mouchel) to deliver the Biogas boosters for gas transportation to the new Waste Gas Burner, forming part of the Burnley Sludge THP Project.

Maple Lodge STW

Maple Lodge STW

As part of Thames Water Utilities Ltd, AMP6 Capital Delivery, Utile were selected to partner Atkins to deliver the Biogas boosters for gas transportation to the Boiler and CHP plant forming part of the Maple Lodge STW CHP upgrade.

US Embassy – London

US Embassy – London

Contracted by Wolseley UK Ltd once again, Utile designed and built a duty/standby natural gas booster package to supply elevated gas pressure to feed the Kitchen equipment, Hot Water Boilers and CHP plant recently installed at the New US Embassy building in London.