Through the AMP 5 Tamesis Joint Venture, Utile have supplied each of these sites with triple (duty, assist & standby) gas booster packages with acoustic enclosures, non return valves, protection switches and gas line isolation valves. These model 125/3A multistage stage, oil free, ATEX compliant biogas boosters will feed gas to the Waste Gas Burner, CHP and boiler plant.

Plant commissioning is anticipated in Spring 2014.

< Previous post: | Next post: >

HAVE A QUESTION? SEND US A MESSAGE!