As part of Thames Water Utilities Ltd, AMP6 Capital Delivery, Utile were selected to partner Costain Eight 2 0 to deliver the Biogas Mixing System in the Sludge Tower, forming part of the Basingstoke THP Project.

The scope of works was to design, build, deliver, install, test and commission a duty/standby gas compressor package and tank mixing system for continuous diffuser feed in the Anaerobic Digester.

The Utile continuous anaerobic, diffused leaf spring, gas mixing system was bespoke designed to mix the specialist Sludge Holding Tower for the new THP sludge processing system.

It comprised duty/standby Utile Model L95HP sliding vane, gas compressors to deliver biogas received at an elevated temperature of 50DegC up to a pressure of 1.72bar(g). All strictly to Thames Water Specifications on time and on budget.

The project was delivered and installed in February 2017 with successful commissioning in June 2017.