Working alongside Veolia Water once more, Utile have supplied a double (duty & standby) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with ATEX and DSEAR requirements, for installation in a zone 1 area. These Utile model U2000 multistage stage, oil free, ATEX compliant biogas boosters with 7.5kW WEG motors will feed 1000m3/hr of biogas to the CHP at a pressure lift of 90mbarg.

Installation is now complete and plant commissioning is due on January 2014.

< Previous post: | Next post: >

HAVE A QUESTION? SEND US A MESSAGE!