New Collaboration

New Collaboration

In the recent publication of Design & Build UK, Utile announced their proud association with Severn Trent Water. In particular the recent works undertaken through NMCN at their Strongford STW’s, which saw the design, manufacture, installation and commissioning of...
St Helens – J Murphy & Sons

St Helens – J Murphy & Sons

Contracted by J Murphy & Sons, Utile have supplied a double (duty & assist) gas booster package with acoustic enclosures, and all relevant mechanical and electrical protection equipment in accordance with IGEM/UP/2 and CE requirements, for installation in the...
Crossness – Gas Holder

Crossness – Gas Holder

Contracted by Skanska through the Eight20 Joint Venture, Utile were chosen to design, supply, install, test and commission this Model B9 113/205, Sattler 270m3 double membrane gas holder for Thames Water as part of their Advanced Energy Recovery (AER) Plant. This...
Liverpool STW – Gas Mixing System

Liverpool STW – Gas Mixing System

Contracted by Eric Wright Water, Utile were chosen to design, manufacture, deliver and install the new anaerobic Gas Mixing System at this United Utilities site. Utile were selected based on their ability to deliver a quality turnkey anaerobic mixing package with the...
Lundwood – Gas Holder

Lundwood – Gas Holder

Contracted by NMCM, Utile were chosen to replace the original Kirk Environmental tank mounted double membrane gas holders at this Yorkshire Water site with Sattler 624m3 Model DMGS-TM-16.76M versions. No.1 digester was taken out of service and upgraded and the new...
Cholsey STW – Air Mixing System

Cholsey STW – Air Mixing System

Contracted by CABV Joint Venture, Utile were chosen to design, manufacture, deliver and install the Sludge Holding Tank Air Mixing System at this Thames Water Utilities site. Utile were selected based on their ability to deliver a quality turnkey aerobic mixing...