Utile news

Utile Gas Boosters

Utile Gas Boosters

Contracted by Ener-G once again, Utile have supplied 8No. natural gas booster packages to supply elevated gas pressure to feed their CHP engines installed on an 18 MWatt gas fired STOR and Peak Power lopping power station.

read more
Southport STW

Southport STW

Contracted by Eric Wright Water we recently supplied and installed a Sattler 3200m3 Model B9 125/250 double membrane gas holder for United Utilities.

read more
Bran Sands STW

Bran Sands STW

In May 2018 we supplied and installed the first Sattler 1190m3 Model B9 118/250 double membrane gas holder to replace the Kirk Biodome GS218.

read more
Bran Sands STW

Bran Sands STW

Contracted by Northumbrian Water direct, Utile have been chosen to replace the 2No. Kirk Biodome GS218 gas holders with Sattler 1190m3 Model B9 118/250.

read more
New Machining Centre

New Machining Centre

Utile Engineering take delivery of a new Doosan H8000, twin 800mm pallet horizontal machining centre.

read more

HAVE A QUESTION? SEND US A MESSAGE!