

Utile news

Banbury STW – Thames Water – Gas Mixing
Utile were chosen by TWUL direct to upgrade their existing Digester Sludge Mixing to the Utile “Continuous Diffuser Gas Mixing System” to provide them with more efficient systems that can be maintained throughout their design life by the multi skilled, fully certified Utile Service Team.

Wargrave STW
Contracted by Costain through the Eight 2 0 Partnership, Utile have recently designed, installed and commissioned an 1100m3 Sattler Double Membrane Gas Holder, at, Thames Water Utilities Wargrave STW site.

Utile are pleased to announce their accreditation to ISO9001
As part of our ongoing quality review Utile are pleased to announce their accreditation to ISO9001.

Article uncovered
An archive article uncovered from a local press release in 1992 highlighting Utile’s long standing influence in the manufacture and supply of Gas Compressors for Digester Gas Mixing Systems.

Berry Hill STW
As part of the overall site refurbishment program, Nomenca have contracted Utile to design, supply and install a 1350m3 Sattler double membrane gas holder for this Wessex Water site.

Davenport Dockyard
Utile were selected by Toroshima Europe Projects Ltd to provide gas boosters to feed their hot water boilers with a variable flow of Natural Gas.