Gas Boosters

  • Utile Gas Boosters

    Contracted by Ener-G once again, Utile have supplied 8No. natural gas booster packages to supply elevated gas pressure to feed their CHP engines installed on an 18 MWatt gas fired STOR and Peak Power lopping power station. Using their Utile 90 series multistage, centrifugal gas boosters, Natural Gas at a flow rate of 500Sm3/hr was […]


  • Burnley STW

    As part of United Utilities Water plc, AMP5 Capital Delivery, Utile were selected to partner KMI Plus, (a joint venture between Keir, J Murphy, Interserve and Mouchel) to deliver the Biogas boosters for gas transportation to the new Waste Gas Burner, forming part of the Burnley Sludge THP Project. The scope of works was to […]


  • Maple Lodge STW

    As part of Thames Water Utilities Ltd, AMP6 Capital Delivery, Utile were selected to partner Atkins to deliver the Biogas boosters for gas transportation to the Boiler and CHP plant forming part of the Maple Lodge STW CHP upgrade. The scope of works was to design, build, deliver, install, test and commission a duty/assist and […]


  • US Embassy – London

    Contracted by Wolseley UK Ltd once again, Utile designed and built a duty/standby natural gas booster package to supply elevated gas pressure to feed the Kitchen equipment, Hot Water Boilers and CHP plant recently installed at the New US Embassy building in London. Using their Utile 90 series multistage, centrifugal gas boosters, Natural Gas at […]


  • Yellow Power

    Utile were chosen by Yellow Power, to design and supply 4No. Model H32 reciprocating Gas Booster Packages to feed high pressure gas to their Jenbacher 620 engine generators. These generators were purchased second hand from the Netherlands where they were used off a medium pressure gas main on Greenhouse heating/energy applications. When installed in the […]


  • Wellington Barracks – London

    Owned by the Ministry of Defence and home to the Grenadier, Coldstream and Queen’s Guard this ageing building is in need of substantial refurbishment. In January 2016 Utile were called by Antac Support Services who provide M&E Support Services to industry, to provide guidance on the gas boosters at Wellington Barracks. They found that two […]


  • Edinburgh Hospital

    Contracted by Edina once again, Utile designed and built a duty/standby natural gas booster package to supply elevated gas pressure to feed the Edina CHP plant recently installed at the Edinburgh Hospital for Sick Children (EHSC). Using their Utile Model 700 single stage, centrifugal gas boosters, Natural Gas at a flow rate of 150Sm3/hr was […]


  • Selfridges – London

    Working direct with Selfridges & Co of Oxford Street, London, Utile designed and built a duty/standby natural gas booster package to supply elevated gas pressure into the new ring main feeding their newly refurbished kitchens and CHP Plant. Complications were met in that the system had to be designed to fit into the existing pipework […]


  • Basingstoke STW

    As part of Thames Water Utilities Ltd, AMP6 Capital Delivery, Utile were selected to partner Costain Eight 2 0 to deliver the Biogas boosters for gas transportation to the Boiler and CHP plant forming part of the Basingstoke THP Project. The scope of works was to design, build, deliver, install, test and commission a duty/standby […]


  • Thames Water Utilities/Edina – CHP Initiative

    As part of the AMP6 Thames Water Utilities drive for energy efficiency, Utile were contracted by Edina to provide their 90 and 125 series multistage centrifugal gas booster packages to deliver Biogas to the Edina CHP plants at Bracknell, Wargrave, Camberley, Ryemeads, Slough and Swindon STW sites. With a total contract value exceeding 132K, in […]