Thames Water Utilities/Edina – CHP Initiative

As part of the AMP6 Thames Water Utilities drive for energy efficiency, Utile were contracted by Edina to provide their 90 and 125 series multistage centrifugal gas booster packages to deliver Biogas to the Edina CHP plants at Bracknell, Wargrave, Camberley, Ryemeads, Slough and Swindon STW sites. With a total contract value exceeding 132K, in partnership with Edina, Utile delivered bespoke equipment compliant to TWUL asset standards as well as IGEM/UP2, ATEX and DSEAR. This incorporated acoustic enclosure’s to maintain a noise level of 65 db’A’ at 1mtr, non-return valves, protection switches, gas line isolation valves and on skid wiring to COMPEX requirements.
Utile’s team of multi skilled and fully certified Gas Safe engineers commissioned the plant and continue to offer aftercare support on these products and many more throughout the Wastewater Industry.

_+44 _(0) 1933 650216

Utile Engineering - Environmental Engineering Solutions

ENVIRONMENT

Utiles' innovative concept for gas booster and compressor design is used to capture and process gases in applications such as Oil Field Vapour Recovery, Anaerobic Digestion, Instrument Venting and Landfill Sites with maximum efficiency. Thus, with installations across the globe, Utile are reducing carbon footprint, providing savings in costs and minimising the impact on the environment.

Utile van

UTILE SERVICE

Utile Engineering, providing you with multi-skilled and highly trained engineers who give a first class level of service.
Read More...

 

Utile Engineering - Made in Britain
Quality British manufacturing
since 1914

EEF




Supplier No. 57407

W3C Valid XHTMLW3C Valid CSS

Website Design and Development Brave Agency